Everyone knows that the skating rink is a flat, icy surface on which you can skate, sled, play hockey. Children and adults get a lot of fun spending fine winter days on the ice arena. This is ordinary miracle under the power to build with your own hands in your country house, in the yard.

natural skating rink

Any frozen body of water can become a place suitable for ice skating. The main thing is to make sure that the thickness of the ice is at least fifteen centimeters. To do this, look at its color. If it is from bluish, greenish to transparent, then this indicates good quality. If you have the opportunity to cut a hole with an ice ax, then measure how frozen the water is in the deepest place with a tape measure.

The advantage of such a surface is ease of execution. The disadvantage is that during the winter the thickness of the ice can change. If there is zero temperature outside for three days, the thickness of the ice decreases by twenty-five percent.


Artificial ice rink

This is a flat area that is filled with water. You can build it right in your backyard. Skating on such an ice rink is much safer than on a natural one. But when building this type of ice rink, you need to spend a little more effort and money.

We build a skating rink in the country ourselves

natural skating rink

  1. Clear snow from an area of ​​the required size. Drill small holes in the corners so that in case of severe frosts the ice does not begin to crumble, and warp during a thaw.
  2. Remove all trash. Otherwise, while riding, you can fall and get injured.
  3. Natural ice cannot be perfectly smooth. It will always have bumps, potholes, cracks, pits. Try to smooth them out. Cut down the highest irregularities with an ax or an ice ax, close the cracks with wet snow, let it harden. If possible, it is best to fill the potholes with a hose with a sprayer.
  4. Remember that the ice rink on the pond also needs to be looked after.


Artificial ice rink

The main condition for a good skating rink on the street is the preparation of the right platform for it.

  1. Its size should not be small. Ideal parameters are 20 x 15 meters.
  2. The air temperature during the construction of the ice rink should not be higher than -10 o C.
  3. Filling the skating rink on the street is carried out in quiet, calm weather.
  4. For high-quality filling, it is better to use a sprayer. Hold the hose at a 30 degree angle.
  5. Pour water clockwise, turning your back to the wind, in a fan way.
  6. Ice is poured to a height of 10-15 centimeters.
  7. A wooden squeegee can be used to level the surface between pours.
  8. If snow falls between fillings, it must be carefully removed.

This is general rules, below we will look at how to fill the rink on different surfaces with our own hands.


paved surface

It’s good when you have a flat asphalt area for a skating rink on your site. It won't be hard to fill it up.

  1. Clear the area of ​​rocks and debris. Pack the snow and level it. If there is a lot of it, it is recommended to remove the top layer.
  2. Along the edges of the site, make a side of the removed snow, filled with water.
  3. Filling is carried out in several stages.

At the first stage, we wet the surface warm water, then pour a layer of cold. Waiting for the ice to stop breaking.

Second phase. Level the surface of the rink with warm water in a thin layer, cold water again on top. We are waiting for it to freeze.

We repeat all operations one more time.

ground surface

It is necessary to build a platform with your own hands when the ground freezes by 7 cm. You can make an ice rink in several ways.

The first one is simpler and less expensive.

  1. We are marking the future ice rink.
  2. Remove all trash.
  3. We compact the area well. To do this, you can use a lawn roller, or jump, run. Try to walk on the prepared snow, if the legs do not fall through, then everything is done correctly.
  4. Make with your own hands a low side about 15-20 centimeters. It can be built from snow flooded with water, earth, boards frozen into the ground.
  5. Along the perimeter of the rink at a distance of two meters from the outer side of the side, clear almost to bare ground. Newly fallen snow will be removed there.
  6. Leave the prepared site for two days to freeze the surface.
  7. Start pouring water from the far side, carefully making sure that there are no missed sections.
  8. Pour the first layer, let it freeze. After about 1.5–2 hours, pour a new layer. Repeat in the same sequence until the desired thickness.


The second method of building a skating rink with your own hands will require a little more effort, but skating rinks in the yard made using this technology can withstand slight thaws. Preparations for the installation of the ice rink begin in the fall, while the first snow has fallen.

  1. We prepare the site, remove all the pebbles, twigs, using a rake.
  2. We knock together a side from the boards end-to-end, it can be used for the next year. From the outside, we fasten the boards with the help of overlays with 4 screws.
  3. We dig in pegs in the corners at a distance of a meter from the side. They should be 10 centimeters higher than the side.
  4. We roll out a light film inside the site without folds and bubbles, lay it in the corners. We fasten it from the outside with the help of overlays. The film must lie freely on the ground.
  5. When the temperature outside drops to -1 o C, start filling the rink with your own hands.
  6. Pour water in a thin stream slowly over 2 hours. On the second day, we repeat the procedure. Fill daily until 5 cm remains to the edge of the side.

Ice rink care

During operation, a do-it-yourself ice rink must be looked after. Any change in the weather affects the quality of the ice. During a heavy snowfall, it is recommended to clean the area without waiting for it to end.

Before skating, using a snow shovel, iron scraper, broom, walk around the rink. This will sand out the marks from the blades of the skates, small cracks.

To give the surface a glassy sheen, use one simple method:

  • Pour a thin layer over ice hot water, and then gently spread it over the surface with a wooden mop;
  • Large potholes, pits are filled with wet snow slurry. After it hardens, pour the rink in one layer;
  • The surface must be renewed at least once a week. But it depends on the intensity of ice use. Ideally, fill should be after each ride. Filling is best done at night.


To make the skating rink colorful, add water-based paint of any color to the water before the last two fills. You can achieve a rainbow effect if you add a different color to each layer. To do this, take the paint, dilute it with water and pour a thin layer on the skating rink, after it freezes, fill it with water from a hose.

A self-made ice rink will bring many pleasant minutes to loved ones. And although this painstaking work will cost you labor and time, these efforts cannot be compared with the pleasure that you experience from skating with family and friends.

Ice rink in the yard, at the stadium, in the sports palace, at the nursery or sports ground, at a school or in a park should be an absolutely flat ice surface made of natural and / or artificial ice, with a fence around the perimeter of the territory, for skating or hockey. It can be used both for mass recreation of all comers, and for sporting events, for example, figure skating or speed skating. starts with, namely rolling snow to obtain a dense base with a thickness of at least 5 cm. Ice filling technology the air temperature should be in the range of -4 / -5 ° C, otherwise the freezing of the surface will last for a whole day.

Standard sizes:
Hockey rink - 26x56 / 29x60 / 37x61 m;
Ice arena - 12x24 / 18x32 / 24x51 / 30x60 m;
Open rollers - 18x25 / 20x40 / 26x56 and more.


Preparing the base for the ice rink includes:
Marking the boundaries of the flooded area;
Compaction of the selected area for pouring ice;
Cleaning the surface of excess stones, debris, filling holes;
Fencing of the site of the future ice rink, fixed with ribs along the border, with solid boards about 23 cm wide and about 6 cm thick (instead, an earthen rampart (without slots) about 9 cm along the perimeter of the zone can also be prepared);
The device of additional free space outside the edges of the ice rink for dumping snow during cleaning, the required width of the territory is about 2 meters.

Filling ice on the rink

Pouring ice according to technology should be done in calm, clear, frosty weather, when the ground has already frozen by 5-7 centimeters, otherwise the water will go into the ground. The platform for the skating rink is filled with a fan, sprayed with a uniform jet at an angle of about 25 - 30 degrees. Thus, there will be no erosion of the surface of the base. The best solution a rubber hose with a sprayer (special tip) connected to the water supply will become a tool. The length of the hose must not restrict access to any of the corners of the site. In the case when the filling of the rink is carried out through a fire hydrant, a rubberized fire hose is used, equipped with a barrel with a spray. Sprinkling of water occurs along a trajectory so that the smallest drops that cover the snow cover of the base fall on the surface in an even layer. The atomizer results in a uniform ice structure on the rink. Such ice filling technology, unlike a continuous jet, helps to avoid the creation of a layered "pie", which begins to crumble quickly during operation due to the formation of voids under the ice crust (this problem is especially relevant when pouring took place at a temperature below 15 ° C).


When the first layer of water is sprayed onto the base with a sprayer, there is confidence that no large puddles have formed, you can safely leave it for 2 to 3 hours to freeze, and then proceed to apply the next layer. Filling subsequent layers ice cover carried out only on the frozen previous layer. The direction of spraying is selected taking into account the direction of the wind, clockwise or counterclockwise, standing with your back to the wind. When the ice has reached a thickness of 2 cm, holes with a diameter of about 0.5 cm may begin to form on it. They are sure to be clogged with wet snow. For a complete ice rink operation in winter, the initial filling should be a layer of ice 10–15 cm thick. This parameter value is taken based on the following two factors:
The weather can prevent the daily filling of the rink;
Skates cut off about 1 - 2 centimeters of the ice layer of the rink per day.

Ice must be cleared of snow before each filling. By no means recommended fill the rink during snowfall, this results in a bumpy ice surface. Maintenance and cleaning of the rink is carried out after each snowfall. If precipitation falls abundantly for a long time, then it is advisable to clean the ice surface without waiting for the end of bad weather. Removed snow should be moved to a separate free area so that it does not reduce the area of ​​\u200b\u200bthe rink. During ice rink construction in the yard, park, ice palace or stadium, be sure to consider that the winter day is very short, and artificial lighting can prolong the use of the site. Lighting installations for hockey rinks and rinks can be floodlights, pole lights or pendant lamps, depending on the type and level of the rink. The height of the lighting above the ice should be at least 5 meters. The degree of illumination of the rink can be increased by giving the ice a white color. To receive white color, at the stage of initial filling, the surface is poured with a solution of chalk or lime, and after it freezes, subsequent fillings are carried out with clean water.


If on ice rink or the arena is supposed to be held sport competitions or training in hockey, speed skating or figure skating, then it is necessary on the ice, usually with paint in the form of blue and red lines no more than 5 cm wide. The paint freezes quickly enough, after which after 5 - 10 minutes marking lines watered from a kettle. To prevent the paint from spreading on the surface, you can pre-clean the lines from snow.

Maintenance and care of the finished ice rink- a very important stage of work to maintain the facility in good condition. It must be regularly cleaned, leveled, corrected and sanded. Smoothing ice can be done with a large mop with a rag and hot water. If pits and deep cuts have already formed on the surface due to intensive use and temperature changes, then, before the next pouring ice according to technology, it is necessary to repair the coating by kneading porridge from snow with water and placing it in holes and cuts. After freezing, the defects are eliminated with a scraper, and the filling of the rink begins.

Winter is a wonderful time. White fluffy snow, ice slides, fun rides and a lot of fresh emotions and pleasure. For many, since childhood, winter has been associated with something fabulous and magical. Unfortunately, there is not always time and opportunity to attend any entertainment events, but you really want to have fun. Owners summer cottages solving this problem is not so difficult: you just need to know how to fill the rink in the yard with your own hands.

Place for a skating rink

Many have repeatedly wondered how to make a skating rink with their own hands in the yard of the house or in any other suitable place for this. It may seem that filling the rink is an impossible task for a person who has never practiced this before. However, it is not. It is only necessary to have some knowledge, thanks to which the ice will really turn out well and will delight all skiers in the cold winter season.

If you decide to fill the rink with your own hands, you must, first of all, find a suitable place on adjoining territory your private property or in any other suitable place. It is important to take into account that this territory is not guarded by special services or access to it is not blocked by any old buildings.

In the local area, it is best to use the backyard. As a rule, there are all the necessary conditions for pouring the rink: a relatively flat ground surface, access to water and the possibility of constant monitoring of the state of the rink.

A hard surface is most suitable for filling the rink, otherwise a large amount of water will be consumed, and the ice may crack over time. However, in the absence of a sufficiently hard surface, the ice rink can also be equipped on the lawn. following the necessary rules.

It is noteworthy that the best basis for pouring ice is asphalt, due to its heavy-duty characteristics. Thus, the ice forms quickly and can withstand a very large load.

Site preparation

After a suitable site has been selected, it is necessary to perform the following manipulations:

Now you can proceed directly to the process of pouring itself.

Pouring ice

Now the most exciting moment has come - pouring ice. It must be approached with special responsibility and observed all the necessary rules:

If small holes appear on the ice, you just need to fill them cold water, after which the surface of the rink is poured again. Thus, the cathot will become more even.

Knowing how to make a skating rink with your own hands, you can save money and time on visiting expensive city skating rinks. closed type. At the same time, your own ice rink, with proper care for it, will delight its owners for a long time.

Territory decoration

You can decorate the area around the ice rink different ways , for example, to fashion snowmen, to build bizarre and intricate animal figures or other patterns from a garland. In this case, the flight of the author's imagination is not limited by anything.

You should also take care of the lighting of the rink, as skating on it is likely to often occur in the evening. Here, street LED spotlights and other lighting devices will be used. The main thing is to bring the power supply network to the rink.

Electric garlands will serve not only as a site lighting, but also create an incredibly romantic and magical atmosphere.

Creating a skating rink on your own is not such a difficult task. You need a little patience, as well as knowledge and observance of certain rules, and, of course, a great desire and indefatigable imagination to bring your plans to life.

One of the favorite children's games New Year- to skate. But where do you get ice? It would seem, what is simpler: he took a hose and filled the platform with water. But no: then the water goes into the ground, then irregularities are formed. And all because the art of "ice making" is well forgotten. In our material, we tell you how to properly fill the skating rink in the country: here you can ride enough and look after the children without leaving home.

The main secret of a successful ice rink is a level ground. Who wants to stumble on a ledge while pirouettes? Therefore, the skating rink is best obtained on asphalt. However, on the ground you can arrange a good platform. The main thing to remember: the skating rink is poured only after the soil freezes to a depth of 5-7 cm, otherwise the water will be absorbed into the ground.

So what is needed.

Mark the boundaries of the rink and clear it of stones, carefully level it. The next step is ramming. Snow is trampled down, crushed with skis or a garden roller.

The thickness of the snow cushion should be at least 5 cm. It is considered ready when you can easily walk on it without falling through. Next - we make bumpers up to 25 cm high, they will not allow water to spread. Frozen boards, earth or snow are suitable for this.

... Outside the window -5 degrees, and even better - minus 10? Let's start filling! The easiest way is to fill the rink with a hose. A sprayer is put on it or the tip is clamped with fingers, and the jet is directed upwards at an angle of 25-30 degrees. Water should not flow onto the site, but shower it with small drops. This is the only way to get a smooth surface. To prevent water from flowing in a continuous stream, some summer residents attach a hose to a shovel. Do not leave the hose lying in one place for a long time.

What happens if you just pour water from a hose or leave it on the site? In severe frost, an ice crust forms on top, under which water and voids accumulate. The top layer will soon warp and crack.

Start pouring the area from the far corner, gradually moving to the opposite. Water is directed by the wind. The next filling can be carried out only after the first layer has hardened well. If it snowed, then it is cleared before pouring. Each time, the pouring starts from a new place so that no hills form.

So, in stages, in layers, the skating rink is poured. With a good frost, you can manage in a day. But in mild cold, it will take several days, or even weeks. Considering that about 1 cm of ice is cut off during a day of skating, you need to freeze at least 10-15 cm. The final stage is smoothing the ice with hot water.

How to take care of the skating rink?

A well-filled ice rink can withstand several thaws. But from time to time he needs care. After each snowfall, the site must be cleared. Throw snow away from the edges of the rink, otherwise they will decrease over time. Potholes and scratches that form during skiing or a thaw require immediate repair. They are filled with a slurry of snow and water and well rammed. When it hardens, level and fill with water.

At least once a week (and if you ride often, then daily), the rink is leveled and polished. The surface is restored by spilling ice again with hot water. If it is not possible to water from a hose, a simple grinding device is made. Put together a box without a bottom (about 200x60 cm). Attach a rubber gasket (for example, a hose cut along the length) to the edges of the box around the entire perimeter.

Place a tank on the box with a faucet or a hose lowered inside. Fill the tank with hot water. When the traction mechanism (snowmobile or yourself :) starts moving, water will flow inside the box.

Thanks to the rubber pads, it spreads evenly over the surface of the rink.

An easier way is to polish the ice by hand with a mop dipped in hot water.

How to paint and decorate an ice rink?

Ice in the country can be made white, like on professional skating rinks. To do this, before the last two pours, pour the site with an aqueous solution of chalk, lime or diluted water-based paint. Are you going to play hockey? Before the last filling of the rink, apply the markings in black, red or blue. Use oil or water based paint.

The width of the lines is at least 5 cm. Do you want to make your ice rink unusual? There is one more “trick”: ice can be colored by adding some dye, for example, gouache or blue, to the pouring water.

Ice skating is an exciting activity. It seems that he just started to ride, and already the evening has come. So don't forget about lighting. Searchlights, several street lamps and garlands will make the process more enjoyable.

Is it possible to fill the ice rink on the lawn?

Landscapers do not advise doing this. And here's why: even if the grass does not freeze without an air cushion, then two more dangers lie in wait for it: it can “suffocate” (it is known that plants “breathe” under the snow) or rot: the ice melts longer. And yet, you can try to fill the ice rink on the lawn, if you play it safe. The first thing to do is to create a thick snow cushion of at least 20 cm.

When a thick snow cushion is poured, it needs to be compacted, and then (the next important condition) - to create a crust of ice. To prevent water from soaking into the snow, the first filling is carried out in severe frost (at least - 10 C).

By the way, special kits for self-assembly ice rink. The kit includes a substrate, a roll of adhesive tape, a tube of waterproof glue (for repairing the material), bumpers and installation instructions. Depending on the configuration and size of the base, such sets cost from 20 to 120 thousand rubles.

Another important task is to make sure that the ice melts faster in the spring, and to divert water in order to prevent the lawn from getting wet. There are several ways to remove ice:

  • mechanically (do not forget that if you break the ice, you can damage the lawn);
  • sprinkle with ashes;
  • scatter some fertilizers (carbamide or potassium chloride), the granules of which will “burn through” the ice;
  • melt with a gas burner;
  • sprinkle with alcohol.

In Germany, for example, discarded wine is used for this purpose. But it is unlikely that a domestic homeowner will be so wasteful.

We wish you a strong winter frost - and let your skating rink turn out to be smooth!

And for inspiration, watch a short video about the ice rink, which is already ready!

It is now necessary to initiate a public discussion of the issue of high-quality filling and maintenance of ice rinks in the city of Samara, since, for example, in the Kirovsky district for 230 thousand people. The only high-quality public ice rink is the ice at the Voskhod stadium, and the entrance costs 150 rubles there. per person with a ban on playing hockey. Such a discussion, firstly, may encourage caring Samara residents to join in helping the municipality in these matters, and secondly, may push the city administration to more thorough preparation of the issue for the next winter season. This season, I believe that the work of the municipal authorities on this issue has been carried out unsatisfactorily. The importance of such work cannot be overestimated, verified by practice. On weekends, from nearby houses, more than 100 people, adults and children, go to the site at a time, throughout the day.

Video "How to fill the skating rink" http://youtu.be/zyE0uQfZpgY

In the fall of 2013, on the territory of my native school No. 73 in Samara, opposite my house, a wonderful multifunctional field with artificial turf was built for playing football and basketball in the summer, and hockey in the winter. Until the end of January 2014, the field was idle "under the tears" of the local children.

Dmitry Kotukov's post "Battle for the Ice" http://simple-kot.livejournal.com/272573.html prompted action. Realizing that with all possible legal efforts and complaints, management companies and other organizations will fill the ice, at best, by the summer, I decided not to waste my emotional strength and time on forcing officials to work, but instead to help them organize the process of filling the ice, because the hockey player of the Metallurg team of the late 80s does not sleep in the soul ...

We ourselves are novice ice-makers and acted on the advice of experienced ones - the director of school No. 58 in Samara Degtev Alexei Petrovich and the director of MP "Parks of Samara" Kandakov Sergey Alexandrovich, for which we thank them very much! Therefore, this instruction shows that everyone who is not indifferent can solve the problem of creating an ice field with certain personal organizational efforts and low costs. The tradition of playing hockey in Russia is preserved, there are also caring people.

Stage 1 - organizational.

Purchase a hose (required only rubber) with an inner diameter of at least 25 mm, a wall thickness of at least 5 mm (it is necessary that the hose does not freeze) and an appropriate length equal to the distance from the water supply source to the extreme point of the site. We found such a hose at a price of 80 rubles/linear meter including VAT;

Make a “drag” for finishing pouring ice with warm water (more on that below);

Find a place where warm water will be supplied from and make a special wiring to such a source of warm water supply with the required outer diameter of the outlet pipe, equal to the inner diameter of the rubber hose;

Decide on assistants (2 people) for pouring ice. These can be both hired workers (our case) and caring public figures. After the ice is filled and the rink starts to function, it will be easier to find assistants. But the first stage - the stage of pouring ice has to be overcome by ourselves;

If the site is to be cleared of excess snow and compacted, then it is necessary to find a qualified specialist - a loader driver;

Purchase a trenching tool for cleaning the site from snow: shovels 4 - 7 pcs., wide scrapers - engines 4 - 7 pcs.

Stage 2 - clearing the field and creating a pillow of snow, about 10 cm thick.

During the winter, about 50 cm of snow accumulated on the field. We invited good specialists- road builders who promised to make the necessary pillow of snow no more than 10 cm and compact it. They kept their word - well done! For 7 hours of clearing the field from excess snow, the loader never touched the fencing net or the sides of the box. Compaction of snow was carried out with a loader bucket while reversing. Snow must be well compacted.


If you start pouring ice immediately from the beginning of winter, then you can not wait for snow to create a snow cushion (if the field is not artificially covered) and pour ice on the existing surface when the average daily sub-zero air temperature sets in for several days in a row.

Stage 3 - creation of a "rough" ice cushion with cold water, approximately 10 - 15 cm thick.

A fire hydrant is best used for this purpose, as it is faster and more efficient than pouring a cushion from a hose that is much smaller than a fire hose. The firefighters of the Kirovsky district of Samara readily responded to the request of the director of school No. 73, Natalia Borisovna Drozhdzha, and provided fire hoses that were no longer in use in order to help the school and local children. Using such fire hoses, we pour the required thickness of ice for three days in a row. Every day we fill the ice with cold water in at least three layers without stopping for at least 4-5 hours. Spilling the extreme territory of the site, the initial one is already freezing and we are returning to the beginning again, and so far as there is enough time and effort. Filling is done in the evening with a transition to the night. By morning, complete freezing of the poured layer of ice is achieved.

Stage 4 - finishing pouring ice with warm water.

For final pouring of ice, we use the so-called. "drag", a special device that consists of one metal pipe(inner diameter 40 - 60 mm) 1.5 - 2 m long, welded at the ends and having holes every 7 - 10 cm along the pipe for supplying water to the ice, and another metal pipe (outer diameter is equal to the inner diameter of the purchased hose), welded to the first in the center with reinforcements, which also acts as a handle. Such a construction as a gift to the children of the microdistrict was made by the masters of the MP "Parks of Samara" under the guidance of the director S.A. Kandakov, special thanks!

We attach a rag to the first pipe, to the places specially provided and made in advance, which will serve to smooth the surface of the ice. We connect the hose to the source of warm water supply, fasten it with a clamp, attach the hose to the drag with a clamp, turn on warm water and start finishing pouring. At least two people work with the drags, one drags the drag along the site, the other works with the hose so that the hose does not fall under the feet of the first and onto the flooded surface. It is better to walk not in a circle, but along the platform forward and backward, gradually approaching the exit so that the hose does not twist. Filling is best done in the evening, at night, preferably in three layers. By the time of the last longitudinal passage with the drags, the layer of the applied first ice has already solidified and it is possible to go again. warm water melts irregularities and gradually leads to a high-quality ice cover. Previously formed cracks and pits must be sealed with snow slurry before final pouring. This work is similar to working with cement mortar. Snow is taken, diluted with water until a snow slurry is obtained and with a trowel we close up the holes and cracks that have formed.

Stage 5 - maintenance of the ice cover.

Depending on the coverage area, 2 - 3 people are needed to keep it in good condition. As mentioned above, finding such people on an already made site is easier than when things are at zero. Snow from the site must be removed as it falls. Filling with ice, 2-3 times a week, depending on the intensity of ice exploitation. For 2 days of operation of medium intensity, skates cut off about 1 - 1.5 cm of ice.

In weather 0 and a slight plus, it is better not to renew the ice, but to clean it; in weather 0 and a slight minus, you can fill it up at night. If the ice is not cleared in time of the snow that fell during the thaw period, then after the frost hits, the snow will weld to the ice and all work may go down the drain.

And finally, I suggest the city administration to solve the issue of filling and maintaining the ice rinks of the city not just by allocating some money http://samara.ru/read/59634for management companies or TOSs, but systemically, by imputing the obligation to fill in ice and its subsequent maintenance at all sites of the city of a single specialized organization (for example: MP "Improvement", MP "Spetsremstroyzelenkhoz", etc.), since Samara residents need these ice fields, and to management companies they are like a dog's fifth leg http://samaratoday.ru/news/100717.

For two days on February 8-9, we open a new ice field with a daily five-hour game of hockey.

Russian people are happy that they have the natural opportunity to skate on real ice, to play hockey on fresh air, engage in figure skating. At this time, children and adults are distracted from zombies, computers, iPads and other husks. It costs a lot.

Health and successful skating!